*C$52.50/t NSR Pit-Constrained and C$96.00/t NSR Out-of-Pit cut-offs applied in current 2024 mineral resource estimates whereas C$30.00/t NSR Pit-Constrained and C$90.00/t NSR Out-of-Pit cut-offs were ...
An updated Mineral Resource Estimate (MRE) and Mineral Reserve estimation have been developed for the Mpama North Mine. These updates replace those announced in the Technical Report of 22 April 2022 ...
A 6 m x 6 m x 6 m block model was created, with sub blocks to 0.5 m x 0.5 m x 0.5 m. Drill composites of 1.0 m intervals were generated within the estimation domains, and subsequent grade estimation ...
The independent qualified persons for the Technical Report, as defined by NI 43-101 guidelines, are Charlotte Athurion, P,Geo., and Pierre-Luc Richard, P. Geo., both of BBA Inc. The effective date of ...
Mineral Resources are estimated at a cut-off grade of 0.33 g/t CuEq based on an underground block cave mining cost of $8.00/t, a processing cost of $12.00/t, and a general & administrative cost of ...